Layout and grades
We mark the streets according to the approved plan and adjust the grades, which the law requires of the owner.
Grading, drainage and stone paving, coordinated with the power and water networks so the streets are built only once.
Last updated: September 29, 2026

We mark the streets according to the approved plan and adjust the grades, which the law requires of the owner.
Curbs and gutters, drains and culverts where the project requires, so water does not damage the street.
Opening and clearing of streets, earthmoving and base preparation.
Laying the paving with level control and finishing of the roadway.
The cost depends on the square meters of roadway, the width, the soil type and topography, the amount of curb and gutter and culverts, the distance from where the stone is sourced, and whether your municipality requires more than stone paving. We quote per meter of street and per lot after the survey. We do not publish a price per square meter without seeing your project.
Paving without drainage deteriorates. The law requires the drainage works that were requested (art. 246 b).
Lay water and power before paving. Repairing afterwards costs more than doing it in order.
The municipality determines the layout (art. 248). A street outside what is approved may have to be redone.
The national law does not set it. It depends on the ordinance. Check it before quoting.
The national law does not say so. The subdivision chapter of Law 3966/10 requires opening streets, adjusting grades and carrying out the requested drainage, not a type of paving. The municipality's ordinance may require it.
At least 16 meters, including sidewalks. Avenues, 32 meters (art. 229).
The municipality determines the layout and the location of squares and public buildings (art. 248), and the project professional must consult it beforehand.
It depends on what your municipality asks for, your budget and the use the neighborhood will have. We present the alternatives with their cost per lot so you can decide.
We calculate it with your project because it depends on the width, the soil, the drainage and the distance to the stone source. We do not give a figure without a survey.
After the boundary marking and layout, and once the water and power networks are laid. That way trenches are not dug across a finished street.
Design, ANDE paperwork and works. See the service →
Network, artesian well and tank. See the service →
Blog guide. Read →
Tell us how many streets the subdivision has and what your municipality asks for, and we will put together a quote by item.
Notice. Informational content. The rules, deadlines and values cited are indicative and may vary by municipality and service provider (ANDE, ESSAP, SENASA, MADES). Always confirm with the relevant body or municipality. It does not constitute legal, tax or engineering advice, nor a promise of profitability. Sources: Law 3966/10 Municipal Organic Law and its amendments (Laws 4198/10, 4715/12 and 5346), Decree 453/13, SET General Resolution 35/2020, ANDE standard No. 01.03.13 Rev. 1 and ANDE commercial procedures manual. Consulted on 09/29/2026.