Network design
Design of the medium- and low-voltage network and of street lighting on your subdivision plan.
We design the network, file it with ANDE and build it with ANDE-type materials, through to the final inspection.
Last updated: September 29, 2026

Design of the medium- and low-voltage network and of street lighting on your subdivision plan.
Filing of the design, follow-up of the approval and of the technical feasibility.
Poles, cables and equipment with ANDE-type materials, and network laying up to each lot.
We coordinate ANDE's inspection during and at the end of the works.
ANDE standard No. 01.03.13 Rev. 1 (04/13/2016) sets the criteria for distribution line projects. They are ANDE's reference criteria for its own networks: your subdivision's design is defined and approved by ANDE.
ANDE's full criteria for subdivision networks (demand per lot, transformers, luminaires) are confirmed with ANDE in each project, because they depend on the area and the expected demand.
If you do not have the plan yet, we make the subdivision design and the geomatics survey for you.
The cost of the power grid changes with the meters of network, the number of lots, the distance to the existing ANDE network, whether a transformer is needed and how much street lighting is designed. We quote by item after seeing the plan and the land. We do not publish prices per pole or per lot without that survey.
The ANDE standard does not allow them, nor palm poles.
Materials must be ANDE-type and approved by its materials unit.
Works start only once the design is approved by ANDE.
Street lighting is defined in the design. Adding it later forces a modification of the network.
ANDE. Its Distribution Projects Department verifies feasibility and approves the design, and Works Supervision inspects the construction.
The subdivision chapter of Law 3966/10 does not list the power grid among the mandatory works after approval. The municipality's ordinance may require it, and without it lots are harder to sell. We confirm what your municipality asks for.
No. The ANDE standard allows reinforced concrete or steel poles of at least 9 meters, and does not allow palm poles.
There is no published timeframe we can cite. We will tell you after filing the design, because it depends on the area and on the agency's workload.
Yes, we design street lighting together with the network and adjust it to what ANDE approves and the municipality requests.
Each lot needs its own supply request to ANDE, which the lot owner files with their title, ID and electrician. We explain the procedure to whoever buys.
Grading, drainage and stone paving. See the service →
Network, artesian well and tank. See the service →
Blog guide. Read →
Send us the plan or the location and we will tell you what the network would look like and what paperwork is needed with ANDE.
Notice. Informational content. The rules, deadlines and values cited are indicative and may vary by municipality and service provider (ANDE, ESSAP, SENASA, MADES). Always confirm with the relevant body or municipality. It does not constitute legal, tax or engineering advice, nor a promise of profitability. Sources: Law 3966/10 Municipal Organic Law and its amendments (Laws 4198/10, 4715/12 and 5346), Decree 453/13, SET General Resolution 35/2020, ANDE standard No. 01.03.13 Rev. 1 and ANDE commercial procedures manual. Consulted on 09/29/2026.